Drill holes into the concrete through the base plate holes.Use high-quality expansion anchors or chemical resin anchors.Torque all bolts to the manufacturer’s specified settings. Step 4: Connecting the Top Crossbeam
Proper site preparation ensures the safety and longevity of your lift. 1. Floor Requirements Reinforced concrete only. Thickness: Minimum 150 mm to 200 mm depth. Strength: Concrete must handle at least 3000 psi.
Do you need help finding (like lifting nuts or pads)? stenhoj ds2 manual
Check for debris blocking one of the carriage rollers. Excessive Noise
Ensure at least 4 meters of overhead clearance. Bay Width: Leave 1 meter of space around the lift posts. Drill holes into the concrete through the base plate holes
Fresh concrete must cure for 28 days before installation. 2. Space and Clearance
Drive the vehicle centrally between the posts. Floor Requirements Reinforced concrete only
Ensure the emergency stop button is not pushed in. Lift Lowers Unevenly