The physical setup typically follows this sequence, as detailed in the GXR-SD Installation Guide : Raise the TS-FC2 or relevant tube stand.
Connect the line power cable. Note that systems like the JADE Mobile X-ray support a free voltage input (100–240V). 4. System Configuration and Calibration drgem x ray service manual install
Secure the HV cable, rotor cable, and earth cable. Ensure all connectors are properly seated to prevent equipment damage. The physical setup typically follows this sequence, as
Perform full automatic mA/kV calibration. If installing for the first time, you may see error E14 (CAL DATA EMPTY) until this is completed. drgem x ray service manual install
Assemble the X-ray and DR I/O terminal blocks.