The ECS 950 control unit uses several internal cards, including the (standard functions) and the manoeuvring card , which features status LEDs for the stop circuit and limit switches.

: The operator is designed for a 35 mm hexagonal shaft . Fit the first stop ring onto the pivot, place the adapter, and push the drive unit onto the shaft.

Are you currently seeing a specific on the ECS 950 display, or are you performing a first-time setup ? 19146212.s21i.faiusr.comhttps://19146212.s21i.faiusr.com

: Switch the power off and then back on before starting the installation sequence.

: The operator should be installed at least 2.5 meters above the floor for safety. Electronic Setup and Commissioning (ECS 950)

: Turn the installation switch ( SW1 ) to the ON position. Calibration : Mark a "1m position" on the door frame.

The Crawford CDM9 complete set typically includes a 0.37 kW motor, approximately 60 Nm of torque, and a 10-meter cable for connection between the motor and the control box. : 340 x 230 x 140 mm.

: Check if the operator is accidentally disengaged or if the contacts (X4/X5) in the control box lid are loose.

: Install the second stop ring and mount the torque bar. A rubber damper must be placed between the torque bar and the console to absorb vibration.

The ECS 950 Service Tool Manual identifies key issues through a service lamp and error codes.

3 корпус
1-комнатные
от 11.6 млн.
2-комнатные
от 17.2 млн.
3-комнатные
от 19.2 млн.
4-комнатные
от 30.6 млн.
crawford cdm9 950 installation manual crawford cdm9 950 installation manual

15%

3-комнатная 69.16 м2
№449
27 этаж
20 678 840 р.
299 000 р./м2
20 678 840 р.
40 087 974 р.
299 000 р./м2

Указанная акционная
стоимость доступна при
100% оплате или ипотеке
без субсидирования

до 05.01.2023