Ashhbritt101 Bathtub 22l Install [better] -
: Connect the tube heads using the provided joints to create a rigid frame.
: Attach the flexible drain hose to the external port. Ensure the other end is directed toward a floor drain or a suitable drainage area. 4. Final Positioning and Leveling ashhbritt101 bathtub 22l install
: Ensure there is enough room around the tub for entry, exit, and access to drainage. : Connect the tube heads using the provided
: Choose a flat, level surface capable of supporting the weight of the tub when filled with 22L (and the weight of the user). ashhbritt101 bathtub 22l install